Purpose of Work Group (WG)
· The RUWG is dedicated to liaising with and providing feedback to EIPC as EIPC develops the integration of the existing regional transmission plans and addresses potential enhancements identified through a gap analysis of the EI-wide 10-year Roll-up Case. These activities are identified as Task 2 in the Statement of Project Objectives; however, the group expects that its charge will extend to other tasks if the Roll-up plan affects either the economics or reliability of macroeconomic futures or transmission build-out scenarios.
· The RUWG will establish a close interface and coordination with the Scenario Planning Work Group (SPWG) so that the conclusions and results of the Roll-up study effort are understood in connection with futures development and scenarios planning.