Report - 2nd Draft


Target #2

Report - Draft (Comments)

Target #1

General Documents

Gas-Electric Documents

Report - Final Draft


​​

​Disclaimer:  References to the DOE-funded study reports and other documents, including the Phase 1, Phase 2, and Gas-Electric Study Reports, contained in any independent study or publication do not constitute or imply endorsement or recommendation by the EIPC.

Target #4

Target #3

Report - Draft (Comments)