Report - Final Draft


​​

​Disclaimer:  References to the DOE-funded study reports and other documents, including the Phase 1, Phase 2, and Gas-Electric Study Reports, contained in any independent study or publication do not constitute or imply endorsement or recommendation by the EIPC.

Target #3

Target #1

Target #4

Report - Draft (Comments)

Report - Draft (Comments)

General Documents

Report - 2nd Draft


Target #2

Gas-Electric Documents