Gas-Electric Phase

The Gas-Electric System Interface Study runs from 2013-2014 and is an extension of the original Phase II Scope.  The four targets of the work are:

  1. A baseline assessment
  2. Evaluation of systems capability to supply
  3. Analyze contingencies
  4. Dual-fuel analysis

​​

You can access subfolders for the Gas-Electric section by using the drop-down above or navigating the links below.